VOLUME 5   ISSUE 43   NOVEMBER 04, 2016

 

By Bruce Jervis

 

When a project owner directs a reduction in the scope of work, the owner is entitled to an equitable reduction in the fixed contract price. This is reasonable – if there is less construction work to perform, there should be less compensation. The difficulty is calculating the amount of the reduction, or credit. Read more.


 

This week's blog highlights from across the industry look at:

 

  • Fair Pay and Safe Workplaces Final Rule Temporarily Halted

  • In-Season Stadium Renovation

  • AIA Urges Congress Not to Repeal the 2030 Energy-Use Goals

Read more...


 

Chinese engineers have built a bridge girder erection machine that cantilevers itself out to drop girders on pre-constructed supports. Recently, we found a video of a radio-controlled (RC) model of the machine. Read more.  

 


 

 

 

 

WPL
PUBLISHING CO, INC.
WPL Publishing - 5750 Bou Avenue #1712 - Rockville, MD 20852

Phone: (301)765-9525  -  Fax: (301)983-4367

All Content and Design Copyright © 2017 WPL Publishing
About Us

Contact Us

Privacy Policy

My Account